SONOMA COUNTY PANEL UPGRADES

Electrical Panel Upgrades in Sonoma County

Replace an aging panel or add capacity for an EV charger, heat pump or remodel. Talk with the electrician who will do the work.

CA C-10 License #1146210 • Fully insured • Sonoma & Napa counties

Collins Electric electrician working on an exterior electrical panel in Sonoma County

Assessment first

A clear scope and estimate before any work starts.

Licensed C-10
#1146210, fully insured

Owner-operated
You talk to the electrician

Former foreman
Custom homes & multi-family

Local
Santa Rosa, Windsor, Healdsburg, Sonoma

When to call

Signs your panel should be checked

Any of these is a good reason to book an assessment. None of them automatically means you need a new panel.

Breakers keep tripping

Repeated trips can point to an overloaded circuit or a panel at its limit.

Corrosion, heat or scorch marks

Rust, discoloration or a warm panel cover should be looked at soon.

Lights dim or flicker

Especially when the AC, dryer or microwave starts up.

Adding an EV charger or heat pump

New loads need a capacity check before they are installed.

Corroded meter socket found by Collins Electric before a panel upgrade

Meter socket corrosion found during a panel assessment.

Not sure what you need? Call or text a description or a photo of your panel. We’ll tell you whether an assessment makes sense.

New meter and breaker panel installed by Collins Electric in Napa

What we handle

Panel work, start to finish

From a straight panel swap to a full service upgrade with PG&E coordination.

Service upgrades (100A to 200A)
More capacity for modern homes, remodels and additions.

Panel replacements and swaps
Replacing outdated, damaged or recalled panels, including Zinsco, Federal Pacific, Sylvania, Challenger and Bryant.

Meter socket and main breaker repairs
Corroded sockets, failed mains and damaged equipment.

Subpanels
For garages, shops, ADUs and outbuildings.

Capacity planning for new loads
EV chargers, heat pumps, induction cooking and solar.

Real work

Recent panel upgrades

Before and after photos from Collins Electric jobs around Sonoma and Napa counties.

Napa
Panel upgrade with new meter socket

Sonoma
Exterior panel upgrade

Old electrical panel in Santa Rosa before a Collins Electric upgrade
New electrical panel installed by Collins Electric in Santa Rosa

Santa Rosa
Panel replacement

Aging meter and panel in Napa before a Collins Electric upgrade
New meter and panel installed by Collins Electric in Napa
Exterior panel in Sonoma before a Collins Electric upgrade
Upgraded exterior panel installed by Collins Electric in Sonoma

Call or text

Tell us what’s happening or what you plan to add. A photo of your panel helps.

On-site assessment

We check your existing equipment, capacity and what the utility will require.

Clear scope and estimate

You get a clear scope and estimate, with scheduling planned around any PG&E work.

How it works

Three steps to a clear plan

Plan ahead

How long PG&E can take

Most of the wait on a service upgrade is the utility, not the installation. We help you plan for it from day one.

2–4 weeks

Simple upgrades and panel swaps
The typical PG&E application process when no utility infrastructure changes are needed.

3–6 months

Upgrades with infrastructure changes
For example larger conduit or wire, a transformer upgrade, or moving a panel away from a gas meter.

These are planning estimates, not guaranteed dates. Timing depends on PG&E and your project’s requirements.

Questions

Panel upgrade FAQs

Don’t see your question? Call or text 707-280-0805.

Ready to plan your panel upgrade?

Talk with the electrician who will do the work.

CA C-10 License #1146210 · Fully insured · 4983 Sonoma Hwy Suite B, Santa Rosa, CA 95409

Service areas: Santa Rosa · Windsor · Healdsburg · Sonoma County, CA